33 CFR 164.80: Towing vessel tests, inspections, and voyage planning

Last reviewed: October 14, 2026

This section sets pre-voyage tests and inspections of gear for towing vessels, with different rules for vessels under 1,600 GT and vessels of 1,600 GT or more. It also requires voyage planning when a towing vessel tows a barge and any part of the voyage is seaward of the baseline of the territorial sea of the U.S. Some towing vessels are exempt from the voyage-planning requirements.

Applies toOwners, masters, and operators of towing vessels, with different requirements for vessels of less than 1,600 GT and vessels of 1,600 GT or more.

What it says

  1. The owner, master, or operator of a towing vessel of less than 1,600 GT must ensure that the listed tests and inspections of gear occur before a voyage of more than 24 hours or when each new master or operator assumes command.

    33 CFR 164.80(a)“shall ensure that the following tests and inspections of gear occur before the vessel embarks on a voyage of more than 24 hours or when each new master or operator assumes command”
  2. For a towing vessel of 1,600 GT or more, the owner, master, or operator must ensure that the listed equipment tests occur at the frequency required by § 164.25.

    33 CFR 164.80(b)“shall ensure that the following tests of equipment occur at the frequency required by § 164.25”
  3. For a towing vessel of 1,600 GT or more, the owner, master, or operator must ensure that the listed gear inspections occur before a voyage of more than 24 hours or when each new master or operator assumes command.

    33 CFR 164.80(b)“that the following inspections of gear occur before the vessel embarks on a voyage of more than 24 hours or when each new master or operator assumes command”
  4. For a vessel of 1,600 GT or more, the terminal gear inspection is visual and covers tackle, bridle and towing pendant connections if applicable, chafing gear, and the winch brake if installed.

    33 CFR 164.80(b)(2)“Visual inspection of tackle; of connections of bridle and towing pendant, if applicable; of chafing gear; and of the winch brake, if installed.”
  5. The voyage-planning requirements do not apply to a public vessel that is both owned, or demise chartered, and operated by the United States Government or a foreign government, and that is not engaged in commercial service.

    33 CFR 164.80(c)(1)(ii)“A public vessel that is both owned, or demise chartered, and operated by the United States Government or by a government of a foreign country; and that is not engaged in commercial service;”
  6. A person who thinks a towing vessel should be exempt for a specified route should submit a written request to the appropriate COTP, who will respond in writing granting or denying it.

    33 CFR 164.80(c)(2)“you should submit a written request to the appropriate COTP. The COTP will provide you with a written response granting or denying your request.”
  7. If any part of the intended voyage is seaward of the baseline of the territorial sea of the U.S., the owner, master, or operator of a vessel employed to tow a barge or barges must ensure the voyage is planned before the vessel embarks.

    33 CFR 164.80(c)(3)“must ensure that the voyage with the barge or barges is planned, taking into account all pertinent information before the vessel embarks on the voyage.”
  8. The master must check the planned route for proximity to hazards before the voyage begins.

    33 CFR 164.80(c)(3)“The master must check the planned route for proximity to hazards before the voyage begins.”

Common questions

When must gear be inspected on a towing vessel of 1,600 GT or more?

Gear inspections must occur before a voyage of more than 24 hours or when each new master or operator assumes command. Equipment tests for these vessels follow the frequency required by § 164.25.

“that the following inspections of gear occur before the vessel embarks on a voyage of more than 24 hours or when each new master or operator assumes command”

Which towing vessels are exempt from voyage planning requirements?

Exempt vessels include those used solely for the listed services, such as harbor-assist, and certain public vessels not engaged in commercial service. Foreign vessels engaged in innocent passage and vessels exempted by the COTP are also exempt.

“A foreign vessel engaged in innocent passage; or”

What must a master do if the route changes during a voyage?

If a decision is made to deviate substantially from the planned route, the master or mate must plan the new route before deviating.

“the master or mate must plan the new route before deviating from the planned route.”

The text of 33 CFR 164.80

Electronic Code of Federal Regulations (eCFR), current as of April 16, 2026 · Read it on eCFR

Tests, inspections, and voyage planning

(a) The owner, master, or operator of each towing vessel of less than 1,600 GT shall ensure that the following tests and inspections of gear occur before the vessel embarks on a voyage of more than 24 hours or when each new master or operator assumes command:

(1) Steering-systems. A test of the steering-gear-control system; a test of the main steering gear from the alternative power supply, if installed; a verification of the rudder-angle indicator relative to the actual position of the rudder; and a visual inspection of the steering gear and its linkage.

(2) Navigational equipment. A test of all installed navigational equipment.

(3) Communications. Operation of all internal vessel control communications and vessel-control alarms, if installed.

(4) Lights. Operation of all navigational lights and all searchlights.

(5) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if applicable; of chafing gear; and of the winch brake, if installed.

(6) Propulsion systems. Visual inspection of the spaces for main propulsion machinery, of machinery, and of devices for monitoring machinery.

(b) The owner, master, or operator of each towing vessel of 1,600 GT or more shall ensure that the following tests of equipment occur at the frequency required by § 164.25 and that the following inspections of gear occur before the vessel embarks on a voyage of more than 24 hours or when each new master or operator assumes command:

(1) Navigational equipment. Tests of onboard equipment as required by § 164.25.

(2) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if applicable; of chafing gear; and of the winch brake, if installed.

(c)(1) The voyage-planning requirements outlined in this section do not apply to you if your towing vessel is—

(i) Used solely for any of the following services or any combination of these services—

(A) Within a limited geographic area, such as a fleeting-area for barges or a commercial facility, and used for restricted service, such as making up or breaking up larger tows;

(B) For harbor-assist;

(C) For assistance towing as defined by 46 CFR 10.103;

(D) For response to emergency or pollution;

(ii) A public vessel that is both owned, or demise chartered, and operated by the United States Government or by a government of a foreign country; and that is not engaged in commercial service;

(iii) A foreign vessel engaged in innocent passage; or

(iv) Exempted by the Captain of the Port (COTP).

(2) If you think your towing vessel should be exempt from these voyage planning requirements for a specified route, you should submit a written request to the appropriate COTP. The COTP will provide you with a written response granting or denying your request.

(3) If any part of a towing vessel's intended voyage is seaward of the baseline (i.e., the shoreward boundary) of the territorial sea of the U.S., then the owner, master, or operator of the vessel, employed to tow a barge or barges, must ensure that the voyage with the barge or barges is planned, taking into account all pertinent information before the vessel embarks on the voyage. The master must check the planned route for proximity to hazards before the voyage begins. During a voyage, if a decision is made to deviate substantially from the planned route, then the master or mate must plan the new route before deviating from the planned route. The voyage plan must follow company policy and consider the following (related requirements noted in parentheses):

(i) Applicable information from nautical charts and publications (also see paragraph (b) of section 164.72), including Coast Pilot, Coast Guard Light List, and Coast Guard Local Notice to Mariners for the port of departure, all ports of call, and the destination;

(ii) Current and forecast weather, including visibility, wind, and sea state for the port of departure, all ports of call, and the destination (also see paragraphs (a)(7) of section 164.78 and (b) of section 164.82);

(iii) Data on tides and currents for the port of departure, all ports of call, and the destination, and the river stages and forecast, if appropriate;

(iv) Forward and after drafts of the barge or barges and under-keel and vertical clearances (air-gaps) for all bridges, ports, and berthing areas;

(v) Pre-departure checklists;

(vi) Calculated speed and estimated time of arrival at proposed waypoints;

(vii) Communication contacts at any Vessel Traffic Services, bridges, and facilities, and any port-specific requirements for VHF radio;

(viii) Any master's or operator's standing orders detailing closest points of approach, special conditions, and critical maneuvers; and

(ix) Whether the towing vessel has sufficient power to control the tow under all foreseeable circumstances.

Sections it refers to

The plain-English explanation on this page was written with AI from the regulation text above and checked automatically before publishing: every quote appears in the text, every number comes from it, and a second model confirmed each statement adds nothing the text doesn't say. Regulation text current as of April 16, 2026. The regulation text governs. RegKnot is not affiliated with the U.S. Coast Guard.