This section sets standards for towlines and terminal gear on each vessel towing astern. The owner, master, or operator must ensure each towline is strong enough, rigged properly, and monitored through records and inspections. They must also ensure the gear that controls, protects, and connects the towline meets listed criteria.
Applies toThe owner, master, or operator of each vessel towing astern.
What it says
The owner, master, or operator of each vessel towing astern must ensure that each towline's strength is adequate for its intended service, considering at least the listed factors.
33 CFR 164.74(a)“shall ensure that the strength of each towline is adequate for its intended service, considering at least the following factors:”
Each towline as rigged must be free of knots.
33 CFR 164.74(a)(2)“Each towline as rigged must be—”
A towline must be free of wire clips except for temporary repair, and a temporary repair must use a thimble and either five wire clips or as many as the manufacturer specifies, whichever is more.
33 CFR 164.74(a)(2)(iii)“Free of wire clips except for temporary repair, for which the towline must have a thimble and either five wire clips or as many wire clips as the manufacturer specifies for the nominal diameter and construction of the towline, whichever is more.”
Visual inspections of the towline must follow the manufacturer's recommendations, or happen at least monthly, and whenever the towline's serviceability is in doubt.
33 CFR 164.74(a)(3)(iii)“Conducting visual inspections of the towline in accordance with the manufacturer's recommendations, or at least monthly, and whenever the serviceability of the towline is in doubt”
If the record of the towline's material condition lapses for three months or more, the owner, master, or operator must retest the towline or remove it from service, except when a vessel is laid up or out of service or has not deployed its towline.
33 CFR 164.74(a)(3)(v)“Once this record lapses for three months or more, except when a vessel is laid up or out of service or has not deployed its towline, the owner, master, or operator shall retest the towline or remove it from service.”
Each terminal gear connection must be secured by at least one nut with at least one cotter pin or other means of preventing its failure.
33 CFR 164.74(b)(2)“Each connection is secured by at least one nut with at least one cotter pin or other means of preventing its failure;”
The vessel must have a method, mechanical or non-mechanical, that easily releases the towline without endangering operating personnel.
33 CFR 164.74(b)(4)“There is provided a method, whether mechanical or non-mechanical, that does not endanger operating personnel but that easily releases the towline;”
Except on a vessel towing in ice on Western Rivers or one using a synthetic or natural fiber towline, a winch that evenly spools and tightly winds the towline must be fitted.
33 CFR 164.74(b)(6)“Except on board a vessel towing in ice on Western Rivers or one using a towline of synthetic or natural fiber, there is fitted a winch that evenly spools and tightly winds the towline; and”
Common questions
How often must a towline be visually inspected?
Visual inspections must follow the manufacturer's recommendations, or happen at least monthly. They must also happen whenever the towline's serviceability is in doubt.
“Conducting visual inspections of the towline in accordance with the manufacturer's recommendations, or at least monthly, and whenever the serviceability of the towline is in doubt”
Can wire clips be used on a towline?
Only for temporary repair. The towline must then have a thimble and either five wire clips or as many as the manufacturer specifies, whichever is more.
“Free of wire clips except for temporary repair, for which the towline must have a thimble and either five wire clips or as many wire clips as the manufacturer specifies for the nominal diameter and construction of the towline, whichever is more.”
Does a towing vessel need a winch?
Generally yes, but not on a vessel towing in ice on Western Rivers or one using a synthetic or natural fiber towline.
“Except on board a vessel towing in ice on Western Rivers or one using a towline of synthetic or natural fiber, there is fitted a winch that evenly spools and tightly winds the towline; and”
The text of 33 CFR 164.74
Electronic Code of Federal Regulations (eCFR), current as of April 16, 2026 · Read it on eCFR
Towline and terminal gear for towing astern
(a) Towline. The owner, master, or operator of each vessel towing astern shall ensure that the strength of each towline is adequate for its intended service, considering at least the following factors:
(1) The size and material of each towline must be—
(i) Appropriate for the horsepower or bollard pull of the vessel;
(ii) Appropriate for the static loads and dynamic loads expected during the intended service;
(iii) Appropriate for the sea conditions expected during the intended service;
(iv) Appropriate for exposure to the marine environment and to any chemicals used or carried on board the vessel;
(v) Appropriate for the temperatures of normal stowage and service on board the vessel;
(vi) Compatible with associated navigational-safety equipment; and
(vii) Appropriate for the likelihood of mechanical damage.
(2) Each towline as rigged must be—
(i) Free of knots;
(ii) Spliced with a thimble, or have a poured socket at its end; and
(iii) Free of wire clips except for temporary repair, for which the towline must have a thimble and either five wire clips or as many wire clips as the manufacturer specifies for the nominal diameter and construction of the towline, whichever is more.
(3) The condition of each towline must be monitored through the—
(i) Keeping on board the towing vessel or in company files of a record of the towline's initial minimum breaking strength as determined by the manufacturer, by a classification (“class”) society authorized in § 157.04 of this chapter, or by a tensile test that meets API Specification 9A, Specification for Wire Rope, Section 3; ASTM D 4268 (incorporated by reference, see § 164.03), Standard Test Method for Testing Fiber Ropes; or Cordage Institute CIA 3, Standard Test Methods for Fiber Rope Including Standard Terminations;
(ii) If the towline is purchased from another owner, master, or operator of a vessel with the intent to use it as a towline or if it is retested for any reason, keeping on board the towing vessel or in company files of a record of each retest of the towline's minimum breaking strength as determined by a class society authorized in § 157.04 of this chapter or by a tensile test that meets API Specification 9A, Section 3; ASTM D 4268 (incorporated by reference, see § 164.03) or Cordage Institute CIA 3, Standard Test Methods;
(iii) Conducting visual inspections of the towline in accordance with the manufacturer's recommendations, or at least monthly, and whenever the serviceability of the towline is in doubt (the inspections being conducted by the owner, master, or operator, or by a person on whom the owner, master, or operator confers the responsibility to take corrective measures appropriate for the use of the towline);
(iv) Evaluating the serviceability of the whole towline or any part of the towline, and removing the whole or part from service either as recommended by the manufacturer or a class society authorized in § 157.04 of this chapter or in accordance with a replacement schedule developed by the owner, master, or operator that accounts for at least the—
(A) Nautical miles on, or time in service of, the towline;
(B) Operating conditions experienced by the towline;
(C) History of loading of the towline;
(D) Surface condition, including corrosion and discoloration, of the towline;
(E) Amount of visible damage to the towline;
(F) Amount of material deterioration indicated by measurements of diameter and, if applicable, measurements of lay extension of the towline; and
(G) Point at which a tensile test proves the minimum breaking strength of the towline inadequate by the standards of paragraph (a)(1) of this section, if necessary; and
(v) Keeping on board the towing vessel or in company files of a record of the material condition of the towline when inspected under paragraphs (a)(3)(iii) and (iv) of this section. Once this record lapses for three months or more, except when a vessel is laid up or out of service or has not deployed its towline, the owner, master, or operator shall retest the towline or remove it from service.
(b) Terminal gear. The owner, master, or operator of each vessel towing astern shall ensure that the gear used to control, protect, and connect each towline meets the following criteria:
(1) The material and size of the terminal gear are appropriate for the strength and anticipated loading of the towline and for the environment;
(2) Each connection is secured by at least one nut with at least one cotter pin or other means of preventing its failure;
(3) The lead of the towline is appropriate to prevent sharp bends in the towline from fairlead blocks, chocks, or tackle;
(4) There is provided a method, whether mechanical or non-mechanical, that does not endanger operating personnel but that easily releases the towline;
(5) The towline is protected from abrasion or chafing by chafing gear, lagging, or other means;
(6) Except on board a vessel towing in ice on Western Rivers or one using a towline of synthetic or natural fiber, there is fitted a winch that evenly spools and tightly winds the towline; and
(7) If a winch is fitted, there is attached to the main drum a brake that has holding power appropriate for the horsepower or bollard pull of the vessel and can be operated without power to the winch.
Sections it refers to
The plain-English explanation on this page was written with AI from the regulation text above and checked automatically before publishing: every quote appears in the text, every number comes from it, and a second model confirmed each statement adds nothing the text doesn't say. Regulation text current as of April 16, 2026. The regulation text governs. RegKnot is not affiliated with the U.S. Coast Guard.